The 3 Phases of Post-Construction Cleaning – What to Know

One of the last parts of a building project is cleaning. Before an apartment or a house is turned over to the owner, the contractor must make sure that it looks presentable. This means it should be free from traces of the construction and building and must look as polished as the model unit or the architect’s sample drawings that were shown during the contract signing.

To get a place from looking like a construction site to looking like a new home, professional post-construction cleaning services typically divide the process into three phases, which we have outlined below.

1. Rough clean – large items

Extensive construction projects often involve installing plumbing, electric works, and framing, among others, and they generate a large amount of trash and debris. The client receiving the turnover unit might not appreciate leftover wood and wires, shavings, sections of plumbing, half-empty paint cans, and other similar items. That is why it is the responsibility of the contractor to make sure that the project site is cleared after construction is complete.

After the place is cleared of large construction debris, more cleaning will follow. Generally, cleaners start with common rooms. The floors must be swept of sawdust, flecks of paint, dust particles, and other byproducts.

Likewise, dusting down of door frames, walls, rails, countertops and cabinets is done during a rough clean. Vacuuming can also be done, especially in corners and hard to reach areas, such as ceilings and between panels. Removal of stickers from doors and windows can also be done. After rough cleaning, the janitorial services can then proceed to the next phase.

2. Light clean – details

The most task-intensive portion of the process is the second stage, where the focus is on specialized rooms. Kitchens, restrooms, boiler rooms, locker rooms, and laundry rooms etc. are cleaned in stage two since these places need a wider variety of equipment and tools.

At this point, the cleaning service will use disinfectants or other cleaning fluids on sinks, toilets, and bathroom floors. Mirrors, backsplashes and glass doors or windows are also included in light cleaning. After this, there is just one last stage before the place is ready to be handed over.

3. Final clean – touching up

The last phase of post-construction clean-up is about checking the smallest things. Final cleaning takes only a short time since the largest items will have been taken care of in previous stages. The third stage will just be about removing minor imperfections, such as fingerprints on glass or mirrors, clearing sticker debris from doors, or sweeping the floor for newly-settled dust.

This stage is also when the janitors clean things such as switches, doorknobs and faucets, and go over the apartment for items left behind during the first two stages.

Make sure the job is done right

A construction site will be fit for a handover once it is cleaned well. This process may take anywhere from a few hours to a few days, depending on the complexity of the project. A contractor will need to hire professional cleaners to help carry out this part of the job. Since they will have many things to deal with, towards the end of a project, it is important that they choose the best cleaning service for their needs.

For post-construction cleaning services in Toronto and the surrounding area, get in touch with us today to see how we can help!